The project consisted of the construction of a 5.2 MG welded steel reservoir to serve the City’s highest pressure zone.
The project also included construction of 2,000 lf of access road and 16-inch water transmission main to serve the new reservoir.
A small CMU building was constructed to house electrical and equipment. A back-up generator was provided to supply power to instrumentation and controls in the event of a power outage.
Gray & Osborne provided pre-design, design, permitting, and construction management support.