Reclaimed Water
Storage Project

Project Details

LOCATION:
Washington State
Client:
LOTT Clean Water Alliance
Primary service:
Water

The project consisted of the design and construction of a 1,000,000 pre-stressed concrete reclaimed water storage reservoir. The reservoir was built into a hillside and a park was constructed on top of the reservoir.

The project also included the installation of 1,600 lf of 18-inch reclaimed water transmission main, construction of a reclaimed water booster station building, and modifications to existing irrigation pumps.